QIDONG HONGAN OFFSHORE CONSTRUCTION CO., LTD
dominic@qidonghongan.com
+86 159 6297 7889
Home
About Us
Company
History
Corporate Vision
Service Items
Quality Management System
HSE
Track Record
Contact
Language
中文简体
中文繁體
English
日本語
한국인
Français
Deutsch
28
2022-07
Construction Completion & Delivery on Aug. 2022 at Siying Marine Tongshun Modules
Construction Completion & Delivery on Aug. 2022 at Siying Marine Tongshun Modules Construction Yard Siying Marine SOW:Construction of R20/30/40/50 four Flow Line Modules, including Structure & Piping Fabrication and Installation; Equipment, E&I Installation; MC; Modules Loadout; Integration at CIMC Raffles.
2022-07-28
10
2022-01
Business started since 1993, with 30 years’ excellent performance in Offshore & Marine Industry.
2022-01-10
12
2021-11
Offshore Facilities & Modules: Engineering, Procurement & Construction ✓ Ship Building, Conversion and Repair ✓ Heavy Equipment Manufacturing
2021-11-12
30
2025-04
Why semi-submersibles operate in deep-sea areas
Deep sea area provides operating space and stability
2025-04-30
What is the buoyant condition of a semi-submersible vessel when loaded with cargo?
The semi-submersible is floating when loaded with cargo. The specific analysis is as follows.
Why is the inside of a semi-submersible ship empty?
The hollow structure is the basis for semi-submersibles to realize their core functions, which not only conforms to the physical principle of floating and sinking